The complete process of installing rooftop solar panels
The complete process of installing rooftop solar panels is done by various procedures. Firstly check the electricity bill for 6-12 months.There should be availaible roof space,roof condition should be fine,electric condition should be working. also,depending on location of the inverter.For a home, you can generally choose between:
ON-GRID:Solar panels + inverter connected to the electricity grid. Usually the lowest-cost option and doesn't require batteries.
OFF-GRID:Solar panels + batteries + inverter. Useful where there is no reliable grid connection.
HYBRID:Solar panels + grid + battery backup.
For an on-grid residential system in India, the required application/approval process is completed with the relevant electricity distribution company (DISCOM). If applying under the PM Surya Ghar scheme, the official rooftop-solar portal provides the application process and related information.Installing the current mounting structure is important.The structure is positioned to recieve good sunlight,minimize shading and providing drainage.The panels are then interconnected using appropriate solar cables or connectors.The inverter is installed in a suitable location, usually protected from direct rain and excessive heat.It converts the panels' DC electricity into AC electricity that can be used by household appliances.The installer connects the panels, inverter and home electrical system using appropriate protection equipment like: wiring,earthing,inverter operation,electrical protection,panel generation and grid connection.Next step is monitoring the inverter and finally,its maintenance(cleaning,checking for shading,inspecting cables and connections and checking inverter status)
What's Your Reaction?